Search results

1 – 10 of 21
Article
Publication date: 1 March 1995

EDWARD W. MERROW and WILLIAM H. CROKER

Chevron has successfully used benchmarking to improve the performance of our project management system.

Abstract

Chevron has successfully used benchmarking to improve the performance of our project management system.

Details

Engineering, Construction and Architectural Management, vol. 2 no. 3
Type: Research Article
ISSN: 0969-9988

Open Access
Article
Publication date: 22 November 2023

Christopher Owen Cox and Hamid Pasaei

According to the Project Management Institute, 70% of projects fail globally. The causes of project failure in many instances can be identified as non-technical or behavioral in…

Abstract

Purpose

According to the Project Management Institute, 70% of projects fail globally. The causes of project failure in many instances can be identified as non-technical or behavioral in nature arising from interactions between participants. These intangible risks can emerge in any project setting but especially in project settings having diversity of cultures, customs, beliefs and traditions of various companies or countries. This paper provides an objective framework to address these intangible risks.

Study design/methodology/approach

This paper presents a structured approach to identify, assess and manage intangible risks to enhance a project team’s ability to meet its objectives. The authors propose a user-friendly framework, Intangible Risk Assessment Methodology for Projects (IRAMP), to address these risks and the factors that cause them. Meta-network (e.g., a network of networks) simulation and established social network analysis (SNA) measures provide a quantitative assessment and ranking of causal events and their influence on the intangible behavior centric risks.

Findings

The proposed IRAMP and meta-network approach were utilized to examine the project delivery process of an international energy firm. Data were gathered using structured interviews, surveys and project team workshops. The use of the IRAMP to highlight intangible risk areas underpinned by the SNA measures led to changes in the company’s organizational structure to enhance project delivery effectiveness.

Originality/value

This work extends the existing project risk management literature by providing a novel objective approach to identify and quantify behavior centric intangible risks and the conditions that cause them to emerge.

Details

International Journal of Industrial Engineering and Operations Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2690-6090

Keywords

Content available
Book part
Publication date: 26 April 2017

Prince Boateng, Zhen Chen and Stephen O. Ogunlana

Abstract

Details

Megaproject Risk Analysis and Simulation
Type: Book
ISBN: 978-1-78635-830-1

Article
Publication date: 1 March 2014

Colette Russell and Joanne Meehan

In the UK, major IT public procurement projects regularly fail at significant cost to the taxpayer. The prevalence of these failures presents scholars with a challenge; to both…

Abstract

In the UK, major IT public procurement projects regularly fail at significant cost to the taxpayer. The prevalence of these failures presents scholars with a challenge; to both understand their genesis and to facilitate learning and prevention. Functional approaches have revealed numerous determinants of failure ranging from procurement specifications to risk escalation, but true and definitive causes remain elusive. However, since failure is not itself an absolute truth, but rather a concept which is reached when support is withdrawn, the survival of a project depends on there being sufficient belief in its legitimacy. We use critical hermeneutic methods and the conceptual lens of legitimacy to reveal powerful legitimating influences that enable and constrain action, but which are not analysed in the retrospective government inquiries that determine lessons learned.

Details

Journal of Public Procurement, vol. 14 no. 4
Type: Research Article
ISSN: 1535-0118

Book part
Publication date: 19 September 2022

Abstract

Details

COVID-19 and the Media in Sub-Saharan Africa: Media Viability, Framing and Health Communication
Type: Book
ISBN: 978-1-80382-272-3

Article
Publication date: 1 March 2022

Feng Jin, Wenwu Xiang, Zheng Ji and Bochen Zhang

The purpose of this paper is to quantify the evolutionary mechanism of coronavirus disease 2019 (COVID-19) impact on international construction multi-projects.

Abstract

Purpose

The purpose of this paper is to quantify the evolutionary mechanism of coronavirus disease 2019 (COVID-19) impact on international construction multi-projects.

Design/methodology/approach

From three concepts of complexity, stressor and detractor risks, a multi-project simulation model under COVID-19 outbreak is proposed to study the characteristics of contingency with three peaks of ordered and disordered states. Specially, COVID-19 brings forth mitigation fee, epidemic prevention fee, holdup fee and schedule delay fee of multi-projects. By integrating parametric model, Monte Carlo and chaos theory, a comparative analysis of its contingency with or without COVID-19 is conducted. Summarizing the simulated results, their total contingencies at certain risk tolerance are obtained at two status of static at one-time point and dynamic over time. Meanwhile, some major risks including detractors, complexities and stressors are screened out for mitigation, especially for epidemic prevention and control. Eventually, the real case is illustrated to demonstrate its validity.

Findings

It provides a quantitative analysis framework for the impact of epidemic, a once-in-a-century black swan event with a long tail, on construction multi-projects.

Practical implications

It conduct an effective model to quantify impacts of COVID-19 on international construction multi-projects for implementing effective counter-measures, which lay foundation for claims among different stakeholders.

Originality/value

The term of detractor risk is applied to describe COVID-19 and quantify its impact upon international construction multi-projects. Further, a hybrid model by integrating parametric model and Monte Carlo in type I/II model is proposed to simulate their contingencies at disordered states. Finally, the simulated outcomes of these models are used to guide effective risk control to meet the requirements by the client.

Details

Engineering, Construction and Architectural Management, vol. 30 no. 8
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 6 February 2023

G. Edward Gibson, Mounir El Asmar, Abdulrahman Yussef and David Ramsey

Assessing front end engineering design (FEED) accuracy is significant for project owners because it can support informed decision-making, including confidence in cost and schedule…

170

Abstract

Purpose

Assessing front end engineering design (FEED) accuracy is significant for project owners because it can support informed decision-making, including confidence in cost and schedule predictions. A framework to measure FEED accuracy does not exist in the literature or in practice, not does systematic data directly linking FEED accuracy to project performance. This paper aims to focus first on gauging and quantifying FEED accuracy, and second on measuring its impact on project performance in terms of cost change, schedule change, change performance, financial performance and customer satisfaction.

Design/methodology/approach

A novel measurement scheme was developed for FEED accuracy as a comprehensive assessment of factors related to the project leadership and execution teams, management processes and resources; to assess the environment surrounding FEED. The development of this framework built on a literature review and focus groups, and used the research charrettes methodology, guided by a research team of 20 industry professionals and input from 48 practitioners representing 31 organizations. Data were collected from 33 large industrial projects representing over $8.8 billion of installed cost, allowing for a statistical analysis of the framework's impact on performance.

Findings

This paper describes: (1) twenty-seven critical FEED accuracy factors; (2) an objective and scalable method to measure FEED accuracy; and (3) data showing that projects with high FEED accuracy outperformed projects with low FEED accuracy by 20 percent in terms of cost growth in relation to their approved budgets.

Practical implications

FEED accuracy is defined as the degree of confidence in the measured level of maturity of the FEED deliverables to serve as a basis of decision at the end of detailed scope, prior to detailed design. Assessing FEED accuracy is significant for project owners because it can support informed decision-making, including confidence in cost and schedule predictions.

Originality/value

FEED accuracy has not been assessed before, and it turned out to have considerable project performance implications. The new framework presented in this paper is the first of its kind, it has been tested rigorously, and it contributes to both the literature body of knowledge as well as to practice. As one industry leader recently stated, “it not only helped to assess the quality and adequacy of the technical documentation required, but also provided an opportunity to check the organization's readiness before making a capital investment decision.”

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 2 October 2007

John Pourdehnad

To propose a complementary approach to traditional project management competency training, and approach that is based on a different worldview.

1550

Abstract

Purpose

To propose a complementary approach to traditional project management competency training, and approach that is based on a different worldview.

Design/methodology/approach

The research for this paper was based primarily on literature searches as well as conducting interviews with a number of project managers.

Findings

The current approach has limitations. Generally, it is good for doing projects in a stable environment.

Research limitations/implications

The new model for project management could be tested and compared to the traditional model.

Practical implications

The practical implication/consequence is an improvement in the project performance. Specifically, the new approach requires the project managers to mange the interaction of the parts of the project rather than managing each part separately.

Originality/value

The problem with project performance is paradigmatic, i.e. using a wrong mindset.

Details

Business Strategy Series, vol. 8 no. 6
Type: Research Article
ISSN: 1751-5637

Keywords

Article
Publication date: 1 March 1919

Through the energetic initiative of “The Globe” newspaper a Middle Classes Union has been formed for the purpose of organising that great body of people into an Alliance that…

Abstract

Through the energetic initiative of “The Globe” newspaper a Middle Classes Union has been formed for the purpose of organising that great body of people into an Alliance that shall be capable of making its power felt. A preliminary meeting was held recently under the presidency of Major J. R. Pretyman Newman, M.P., of gentlemen interested in the scheme recently outlined in “The Globe” for combining the Middle Classes in a Union for their own protection. All present were unanimous as to the necessity for the formation of such an organisation, and after discussion it was provisionally agreed that its title should be—

Details

British Food Journal, vol. 21 no. 3
Type: Research Article
ISSN: 0007-070X

Article
Publication date: 1 June 1969

The statement of the Minister of Agriculture, Fisheries and Food, coming so quickly after the ban on the use of cyclamates in food and drink in the United States, indicates that…

Abstract

The statement of the Minister of Agriculture, Fisheries and Food, coming so quickly after the ban on the use of cyclamates in food and drink in the United States, indicates that the new evidence of carcinogenesis in animals, placed at the disposal of the authorities by the U.S. F.D.A., has been accepted; at least, until the results of investigations being carried out in this country are available. The evidence was as new to the U.S. authorities as to our own and in the light of it, they could no longer regard the substances as in the GRAS class of food additives. It is, of course, right that any substance of which there is the slightest doubt should be removed from use; not as the result of food neuroses and health scares, but only on the basis of scientific evidence, however remote the connection. It is also right that there should always be power of selection by consumers avoidance is usually possible with other things known to be harmful, such as smoking and alcohol; in other cases, especially with chemical additives to food and drink, there must be pre‐knowledge, so that those who do not wish to consume food or drink containing such additives can ascertain from labelling those commodities which contain them.

Details

British Food Journal, vol. 71 no. 6
Type: Research Article
ISSN: 0007-070X

1 – 10 of 21